Huapujie Electric Gas Cabinet Helps Huawei Cloud Data Center Construction
project introduction
Huapujie Electric Gas Cabinet Helps Huawei Cloud Data Center Construction
The oil supply site of the generator system in the second phase of the data center consists of electronic control equipment rooms composed of individual containers. Intensive management ensures orderly operation on site. The above picture shows two sets of PLC control cabinets produced by Huapujie Electric in the container. Responsible for centralized automatic control of the entire fuel supply system. After the external wiring of the on-site cabinet is completed, Huapujie xue rushed to the Ulanqab site to debug the electrical control cabinet. Until the user's acceptance is qualified. This system adopts Siemens MAG VFC、 Schneider and other internationally renowned brand components provide a solid guarantee for the stable operation of data centers.
Application Highlights
● The Siemens 1500 series PLC program module uses redundant CPU 1513R-1 PN. High stability and low failure rate.
● MAG VFC gas station dedicated frequency converter can provide higher and consistent flow. During peak business hours, stable traffic can be provided, allowing for quick and stable refueling to improve efficiency.
● Non standard customization of electrical control cabinets to meet the actual usage needs of users. Flexible control.
● As shown in the left figure, through the Kunlun Tong state touch screen display, users can intuitively observe the storage status and working condition of the oil tank. Make predictions for on-site equipment systems.
● It can provide a global overview of the entire oil supply system and switch to different states on different screens to monitor the oil level in the oil supply tank. If the oil level is lower than the set level, the electrical cabinet system will issue an emergency alarm signal.
Intelligent control equipment operation. Improve efficiency and reduce losses!

Intelligent Manufacturing / Industry 4.0
Motor Control Center MCC
Data Center
Environmental Industry
Industrial Machinery
New Energy
Pharmaceutical Manufacturing
Petroleum & Chemical
Marine & Offshore & Ship
Food processing / agricultural production